ABOUT US

SERVICES PRODUCTS PROJECTS CONTACT US REFERENCES

SEAGATE TOWERS
Delray Beach, Florida
 

The Seagate Towers Condominiums project consisted of two thirteen-story towers with a total of 150 individual residential owners. Performance Glass Associates / Glass America began this project on July 12, 2007 and completed it prior to the Thanksgiving 2007 Holiday Season. The original time frame that was contractually agreed upon was seven months. However, Performance Glass Associates / Glass America completed the installation of over 1,000 Large Missile Impact Resistant window units and 300 Large Missile Impact Resistant sliding door units in FOUR AND ONE-HALF months! Not only were the unit owners ecstatic, but the manufacturers and representatives within the industry could simply not believe it! PGA / Glass America were overwhelmed with the compliments and comments such as "We have NEVER seen any job run so smoothly and completed so quickly." Obviously, none of this would have been possible without the superb performance of the Manufacturers, Innovative Window Concepts and WinDoor Incorporated. Their respective quality craftsmanship and on-time deliveries were paramount in this industry-recognized success.

In addition to the individual units mentioned above, PGA / Glass America also retro-fitted the common areas of both towers complete with Large Missile Impact Resistant Automatic Sliding Glass Doors and Large Missile Impact Resistant fixed glass. Furthermore, PGA / Glass America oversaw an office addition and expansion consisting of new poured concrete walls, stucco, paint and interior drywall and paint. Finally, many owners chose to remove their bulky, rather unsightly, roll-down hurricane shutters. PGA / Glass America removed said shutters, disposed of them and applied new stucco and paint to the affected areas of the building.

The Buildings' Association spent a great deal of time and money replacing and beautifying their elevator cars and did not want any of the windows or sliding glass doors being transported through them. Therefore, all of the products were transported to the respective units via material hoists and all of the old, antiquated, windows and sliding glass doors were removed via swing stages from the exterior of the building. In fact, PGA / Glass America utilized SEVEN swing stages, simultaneously, to accomplish this mission.

© 2007 Performance Glass Associates

HOME

FAQS CONTACT US